Uploading OBJ but tiling stuck at 38% for more than 24 hours

Hi, sorry you are having issues with this asset. The tiling job will time out after 24 hours.

This asset looks like it was uploaded with the 3D Model setting. Since it is a city wide model, have you tried it with the 3D Capture setting? Here is more information about the difference between the two settings.